Thursday, September 04, 2008
More Progress
A lot of things happen, but there isn't much to be shown.
Here's a detail from a balcony door. The different levels will disappear as the floor heating is installed. Finally the parquet floor is placed on top and reaches all the way to the door. Will probably look quite nice.
What could this be? This device does not look the way it should, but it is a vacuum cleaner. It is actually the central unit of the central vacuum cleaner.
Here's the basement's hall ceiling. Plumming, cold and hot water pipes and electrical wiring fight for slots to reside in. There is also a plastic box for ceiling spotligths. This box isolates the hot spotlight from the surrounding ceiling.
Finally a picture from big brother's window towards north. A window-sill has been mounted. Looks quite nice, doesn't it?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment