Heare is a sequence of pictures from what has happened the last 24 hours.
Saturday, October 11, 2008
Report from an Ordinary Day
Reported on September 17:
Heare is a sequence of pictures from what has happened the last 24 hours.
Here you see the floor heating loops on the upper floor's bathroom. The aluminium reflectors are upside down to facilitate the casting of the fluent putty.
Compare this picture to yesterday's! Now a layer of special plastic boards has been put on top of the floor heating pipes. Thees plastic boards are handled with special care being harder and more crispy. The upper floor is now set for the laying of the parquet floors, occurring after the painting of all walls.
Here's the ongoing insulation and sound damping work in the living room towards the upper floor.
Here are the connections from the house to the geothermal holes.
Two holes were bored because water was encounter at the depth of 115 meters. The holes incline seven degrees different directions.
Here's E r i k is water tightening the pipes that lead to the boiler room.
An finally this is how the pipes from the holes end up in the boiler room. The larger "hose" below contains two pipes that lead to the solar panel on the living room's roof. Ready for installation!
Heare is a sequence of pictures from what has happened the last 24 hours.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment