Report from March 28:
Today, the first house kit arrive. A huge 30-ton (metric) crane was on site to distribute the delivery of goods:

This picture was taken 50 meters away and reveals the size of the crane.
On the next picture the structural basement walls have been mounted:

You might see that things go fast and that the carpenters prepare for the bottom floor's system of beams.

Here's the Nestor of the general contractor and the L in L M R, L a s s e, looking at a drawing of the system of beams. L a s s e usually appears during house kit deliveries, in order to properly analyze the contents of the delivery and to contribute to the decision-making when large building blocks are to be assembled. Behind L a s s e is L a s s e #2 who will work with our house for quite some time, possibly until the completion. L a s s e #2 will work closely with J o h a n who might appear in the next post.
Finally a picture of the drawing of the system of beams:

To enlare the picture, click on it.