Wednesday, November 12, 2008

Back on the Track

Reported on November 10.

Barely ten calendar days and seven workdays remain until the moving in, we hope. Now the carpenters have got farther than we had expected, but they claim there is a lot of remaining work. The biggest threat to the schedule has been cleared away. Last Friday, you see, the missing sinks were delivered. The suspense was by itself a problem because a lot of sub-operations depend on the sinks and benches being mounted.

This is how the right sink and benches should look sideways. L M R has worked out a solution with black borders under the benches. We think it looks like the benches float. What do you think?

Here, two guys representatives from A k t i v   E n e r g i (Active Energy) have unpacked and placed the geothermal and solar panel heat pump. Afterwards, a 200-liter accumulator tank was added. After that I went cykling to the office. Probably these gús and B e n n y have installed the pump and everything including the water heater. After that, the plumbers are expected to connect the hot and cold water pipes as well as all pipes/hoses to the floor heating.

No comments: