The Staircase

Reported on October 14:

Eight craftsmen are on site now: three painters, three carpenters and two electicians.

S t e f a n is mounting spotlights in the kitchen. The electicians have written notes on the positions of the boxes over the spotlights that isolate the heat from the spotlights from the system of beams.

Here's the staircase from the ground floor to the upper floor installed yesterday. You see the carpenters L a s s e (left), A d d e (right) and K j e l l (in the staircase) applying protective pasteboard on the steps and on the parquet floor.

Here's a detail from the staircase's "inside track". Here, the carpenters are constructing a wall covering the pillar and providing a more homogeneous impression. L a s s e continues to cover the parquet floor below the staircase.

In the boiler room, J o h a n starts to connect all the wires to the central fuse panel.