Wednesday, March 12, 2008

Ready for Bricklaying

Today's pictures are not very dramatic. Here's the first:

Here the concrete has hardened completely. The general contractor team is very happy with result (the casting was executed by a sub-contractor). The foundation is as plane as expected by L M R.

Detail picture:

This image shows the foundation under the based shower. You can see that the floor intentionally descends towards the floor drain and that is why the water remains there.

Finally a picture for the L M R fans:

Here is the top layer of L M R 's construction team discussing the forthcoming bricklaying.